Fix 1 of 2
Set up two-bin kanban at the line for common materials
When the first bin empties it goes back to be refilled while the line uses the second. Materials arrive before they run out, and nobody has to go chasing.
- 1Pick the materials that run short most often.
- 2Size two bins for each, so one bin covers the refill time.
- 3Agree the refill route and times with the warehouse or water spider.
- 4Review shortages weekly and resize bins that still run out.
Tools: Bins and cards · Your ERP or WMS e-kanban