Fix 1 of 2
Build the report once so it refreshes itself
Connect the spreadsheet or dashboard straight to the source so next week's report is already done.
- 1List where each number comes from.
- 2Use Power Query (Excel), a connected sheet, or a Google Data Studio or Power BI dashboard pulling from the source.
- 3Schedule the refresh and send the link instead of an attachment.
Tools: Excel Power Query · Power BI · Google Data Studio (formerly Looker Studio) · Google Sheets connectors